- Insolvency Insider Canada
- Posts
- BioÉnergie AE Côte-Nord Canada Inc
BioÉnergie AE Côte-Nord Canada Inc
BioÉnergie AE Côte-Nord Canada Inc., which is a joint venture founded in 2012 between Biogaz SP S.E.N.C. and Ensyn BioEnergy Canada Inc. for the construction and operation of a biofuel factory in Port-Cartier, Quebec, obtained protection under the CCAA on May 5. Construction of the factory has been negatively affected by several delays and cost overruns. While most of the construction of the factory is now completed, it still does not have the capacity to produce biofuel in the volumes and level of quality provided for in various contracts. As a result of these operational issues, there is ongoing litigation between certain parties regarding who should pay for the costs of rectifying the defects that are preventing the plant from operating as intended. Raymond Chabot was appointed monitor. Counsel is Miller Thomson for the BioÉnergie AE Côte-Nord Canada Inc., Woods for Biogaz SP S.E.N.C., and BLG for Ensyn BioEnergy Canada Inc.